Monday, October 9, 2023

Article 16 Urban Forestry Ordinance Section 805(b) (3) (A): “If private property owner plants a Street, the City shall not be liable for such injuries and property damage until the Street Tree’s establishment. The establishment period for newly planted Street Trees shall be three (3) years from the date of Planting. Until the establishment of a Street Trees, the adjacent property owner shall be liable. Survey June 2023 (3) 455 Fell on Hickory 2 empty plots at 475 Fell/Laguna corner 1 empty tree plot. (2) 555 Fulton on Birch 1 plot with stump. On Octavia next to garage 1 plot brink over. (2) 1 Haight /1700 Market Street on Haight side 2 empty tree plots. (1) 150 Van Ness on corner bldg of Hayes and Polk on Polk Street side 1 empty plot with 2 inch stump. (2) 8 Octavia 2 empty plots on Octavia near Haight Street (1) 95 Laguna Street 1 empty tree plot 100 Haight Street 4 street tree need tree protection put up again. 188 Octavia landscaping next to build needs planting and 2 large landscaping plots next to the street need landscaping sidewalk gardens not planted Total of Ten (10) trees to be replanted and possible more with the landscaping sidewalks in the New Development in Hayes Valley. THE ABOVE SURVEY IS THE PROPRTY OF: TENDERLOIN TREE CAMPAIGN

No comments:

Post a Comment